Vector Surfaces, architectural vinyl wraps

The finish changes.
Nothing else does.

Vector Surfaces resurfaces cabinetry, countertops, doors, walls, and elevator interiors with architectural vinyl film. Commercial buildings, private homes, and yacht interiors across South Florida, finished in days instead of months, with no demolition.

South Florida Commercial · Residential · Marine
Butler's pantry after resurfacing, blonde wood cabinet fronts
The same pantry before resurfacing, flat white cabinet fronts
Before After
Butler's pantry · Flat white to blonde wood · Drag, or use the arrow keys, to compare

Replacing a surface costs far more than the surface

Tearing out doors, millwork, and wall panels means permits, lead times, dumpsters, trades stacked on top of each other, and a space nobody can occupy. In most of these projects the finish was the only thing anyone actually wanted to change.

Architectural film changes it in place. The substrate stays, the hardware stays, and the floor stays in service.

Surface schedule

Every interior surface we resurface, what a typical scope covers, and how long the surface is out of service.

Surfaces Vector Surfaces resurfaces in commercial buildings
SurfaceNotes
Commercial doorsHollow metal, wood, and frames resurfaced in place. Doors stay hung and keying is untouched. Most doors take twenty minutes to an hour.
Elevator interiorsCab walls, ceilings, and returns refinished overnight so cars run before the morning rush.
Elevator landingsLanding doors and jambs on every floor, matched to the cab so the building reads as one design.
Walls and columnsCorridors, lobbies, and accent walls in wood, stone, metal, and solid finishes.
Casework and millworkReception desks, nurse stations, built-ins, and cabinetry refinished without pulling a unit. Most casework and millwork is finished in a fraction of the time replacement would take.
Ceilings and soffitsOverhead surfaces refinished from a lift rather than through a ceiling demo.

Commercial work

Before and after on South Florida commercial projects, every one installed while the building stayed open.

Before
Before
After
After
Project nameProperty type · City · Scope · Days on site
Before
Before
After
After
Project nameProperty type · City · Scope · Days on site

Homes and yachts

The same film and the same crews, applied to kitchens, vanities, countertops, and joinery. Cabinet boxes stay in the wall and the room goes back into use the same week.

Before
Kitchen before resurfacing, gloss white cabinets with an orange hood and oven surroundBefore
After
The same kitchen after resurfacing, cabinets hood and oven surround in matte charcoalAfter
Kitchen cabinetry, hood, and oven surroundGloss white and orange to matte charcoal
Before
Primary bath vanity before resurfacing, dark walnut drawer fronts and frameBefore
After
The same vanity after resurfacing, light white oak drawer fronts and frameAfter
Primary bath vanityDark walnut to light white oak, frame and six drawer fronts
Before
Floating guest vanity before resurfacing, high gloss macassar doorsBefore
After
The same floating vanity after resurfacing, weathered grey oak doorsAfter
Floating guest vanityHigh gloss macassar to weathered grey oak, doors and carcass
Before
Yacht galley countertop before resurfacing, plain cream solid surfaceBefore
After
The same galley countertop after resurfacing, white marble finishAfter
Yacht galley countertopSolid cream to white marble, top and edge profile
Residential and marine surfaces Vector Surfaces refinishes
SurfaceWhat we refinish
Kitchen cabinetryDoors, drawer fronts, tall units, panel ends, and toe kicks refinished on the box. Hinges, slides, and carcasses are never removed.
VanitiesDrawer fronts, doors, frames, and floating carcasses in primary, guest, and powder baths.
CountertopsSolid surface and laminate tops refinished in stone, marble, and concrete patterns.
Interior doorsPassage, closet, and pocket doors, with frames refinished to match.
Built-ins and millworkMedia walls, closet systems, wet bars, and window seats.
Yacht joineryGalley cabinetry, countertops, and interior panels for marine interiors.

What lands on your desk

Property managers and general contractors need paperwork before they need a finish. Here is what comes with the scope.

Scope
A counted surface listDoors, frames, landings, and linear feet of casework, counted on the walkthrough. That count is what you get priced on.
Pricing
Fixed, not unit-rateNo change orders on square footage that was already measured. Additions are priced as additions.
Schedule
Built around occupancyNights, weekends, floor by floor, wing by wing, with no dumpster parked out front for a month.
Finish schedule
Signed off before orderPhysical samples on site. Nothing is ordered until you approve the finish against the actual light in the space.
Closeout
Punch closed same visitWalkthrough at completion with a written workmanship warranty on file.
Station 1

Walkthrough and count

We measure and count every surface in scope, then confirm substrate condition on each one.

Station 2

Finish selection

Physical samples on site. You approve the finish schedule before any material is ordered.

Station 3

Installation

Crews work your schedule. Surfaces are cleaned, prepped, and wrapped in place.

Station 4

Closeout

Punch list closed on the same visit, warranty issued, documentation filed.

Finishes

Layered film with printed pattern, embossed texture, and a protective topcoat. Wood, stone, metal, textile, concrete, and solid color, in more than 500 finishes. Up close it reads as the material it imitates. Five from the range below, specified by code.

Soft cream architectural film, MT1705
Soft creamMT1705
Natural oak architectural film, PW1518
Natural oakPW1518
Warm walnut architectural film, PW1520
Warm walnutPW1520
Charcoal linen architectural film, FP1842
Charcoal linenFP1842
Brushed metal architectural film, ME1213
Brushed metalME1213

Samples ship free. Ask for the finishes that suit your space.

Questions

How long does architectural film last?

On interior surfaces, ten or more years is typical. The wear points are high-touch areas like door push zones and elevator returns, and those can be spot-replaced without redoing the room.

Can you work while we are open?

Yes, and that is most of what we do. Installation runs quiet and dry, with nothing heavier than a lift on site, so we can work nights, weekends, and floor by floor around your occupancy.

What does it cost?

It depends on surface count and finish. As a rule it runs well below tearout and replacement, and the larger saving is usually the downtime you avoid. Send photos or a floor plan and you get a real number.

What surfaces will not work?

Heavily textured, flaking, or actively delaminating substrates need repair first. Deep-grain block, rough stucco, and failing laminate are the usual disqualifiers. We flag those at the walkthrough rather than after the deposit.

Get a surface count and a number

Send photos or a floor plan. You get back a scope, a finish schedule, and fixed pricing. No obligation.

Surfaces in scope
One file per field, 8MB total. Reply within one business day. Or email info@vectorsurfaces.com